
- Project Name Swimming Pool
- Category Pool
- Duration 10 Days
- Location Maeen 1 Emerats Hill Dubai
Project Summery
The project involved the complete construction and finishing of a swimming pool facility, including structural works, waterproofing, pool finishing, and surrounding landscape elements. The scope covered excavation, reinforced concrete works, pool shell construction, tiling, decking, and installation of high-quality pool finishes aligned with client requirements.
The MEP works included installation of pool filtration and circulation systems, pumps, water treatment and chemical dosing systems, underwater lighting, drainage, and plumbing networks. Electrical works covered power supply for equipment, control panels, and integration of automated pool management systems.
The objective was to deliver a safe, durable, and aesthetically appealing swimming pool facility while complying with local regulations, health and safety standards, and international best practices. The project required close coordination between civil, MEP, and finishing teams to ensure proper system integration and timely completion.
Project Challenges
The project faced challenges related to ground conditions, water table levels, and ensuring effective waterproofing to prevent leakage. Precise coordination between civil and MEP teams was essential for embedding pipelines, fittings, and pool equipment without compromising structural integrity.
Additional challenges included procurement of specialized pool equipment, maintaining strict quality control for finishes, and ensuring proper installation of filtration and treatment systems. Working within project timelines, adhering to safety standards, and achieving optimal system performance were critical aspects throughout the execution.

